for unloading造句
例句与造句
- y10 in guang zhou " bai yun " airport for unloading
运10飞机在广州白云机场卸货 - support is provided for unloading an application domain
为卸载应用程序域提供了支持。 - calculation for unloading capacity of unloader
卸料机卸料能力的计算 - for unloading application domains
用于卸载应用程序域。 - you must allow standing space in front of the dishwasher for unloading
你必须让站在门前的空间供洗碗机卸载 - It's difficult to find for unloading in a sentence. 用for unloading造句挺难的
- the causes and prevention measures of vapor lock of swing arm for unloading oil
卸油鹤管气阻的产生及防治对策 - make necessary preparation in fuel department for unloading frozen coal in winter
做好燃料部冬季卸冻煤的准备工作。 - the emulation shows that it is feasible for unloading scheduling
通过算例仿真,验证了使用该方法调度出库作业的可行性。 - directory for data extraction has plenty of space for unloading the source database into flat files
中指定的目录有足够的空间,以便将源数据库卸载到文本文件中。 - application domains provide an isolation boundary for security, reliability, and versioning, and for unloading assemblies
应用程序域为安全性、可靠性、版本控制以及卸载程序集提供了隔离边界。 - if delivery occurs at the seller s premises, the seller is responsible for loading . if delivery occurs at any other place, the seller is not responsible for unloading
若卖方在其所在地交货,则卖方应负责装货,若卖方在任何其他地点交货,卖方不负责卸货。 - compared with the traditional numerical method, the numerical manifold method need not calculate the released load on excavation face, need not prepare special element for unloaded material part; simple mathematic grid can meet the arbitrary course of excavation; so it is more convenient and effective; at the same time, high-order manifold method has better precision for excavation
相对于传统数值方法,数值流形方法在模拟开挖时不用计算开挖面上的释放荷载,不用为卸除的材料部分准备专门的单元,简单的数学网格可以适应任意的开挖过程,使其对开挖的模拟更加简便和有效,同时高阶的流形方法对开挖问题具有较高的求解精度。 - with example of guye station, through investigating the unloading status of the station, the essay puts forward the measures on increasing unloading capacity from the aspects on changing hardware equipments, establishing more tracks for unloading, optimizing transport organization, establishing train shunting and unloading plan, preparing storage capacity to receive and unload incoming trains, and exerting the regional cooperation capacity
摘要以古冶站为例,通过对该站卸车情况的调查,从改变硬件设施、增设卸车线路、优化运输组织,制定调卸车预案,预储接卸能力,发挥区域协作能力等各方面,提出提高卸车能力的措施。 - the relative disadvantage angle of transfixion crack how to affect rock mass stabilization can be researched in this article, and the mechanics characteristic in the unloading process for unloading rock mass with single transfixion crack also be analyzed, which affords theory reference to projects of unloading rock mass with single transfixion crack
通过试验,探讨了贯通裂隙影响岩体稳定的相对不利倾角以及单贯通裂隙岩体卸荷过程的力学特征,得出裂隙位置的变化促成岩体变形的递变;特殊位置的裂隙促使岩体的各向导性更加明显的结论,为相关工程问题提供理论参考。 - this paper will be key to study the transform scheme on the systematic unit that is concerned with and needs for satisfying on each unit design . part for unload ship equipment, transfer and transport equipment, the access ability of storage yard, shipment and assign redundant technology and so on, the research will make optimization analysis, and carry out the transform scheme
本文将重点研究系统改造涉及的各个单元,对各单元的不同需要不同特点作了分析,分别对卸船设备、转运及输送设备、堆场存取能力、装船及分流工艺等环节进行方案分析,继而提出具体的改造方案。